|
New airport at Wellington |
|
Turner's Christmas train |
|
elevator add to coaling tower |
|
wire coil loads being cast |
Beside the above additions, we are working on a car card system and adding a wye at the end of Miller, to turn trains and connect the Island to the mainland. This wye will hinged for the fire exit. This wye also meant we could remove the small turntable at Miller and replace it with a couple of small industries. We may also rework the car float area at Miller into a coal dock.
Another upgrade will be to add a off on switch to the front turntable track in Wellington. Then when locomotives are placed on the layout at either Wellington or Elsewhere, it can be done on a dead track and no short out the layout.
No comments:
Post a Comment