As Jim, Donald and me add more feeders, Mike and Trent start ballasting the upper loop.
Tom (who we ellected as president because he was late for the meeting) is hard at work on the branch line.
Almost everyone worked on the line to the power plant. As the traffic to the power plant has been drastically reduced, 1 siding was cut short and joined to the other one forming a run around. This will let operators pull in the coal cars and then run around them to drop them off, instead of having to push them all the way down the siding.
The ties were left in place to represent
abandoned track.
No comments:
Post a Comment