The Woodstock Model Railroad Club invites you to come along with as together we build an empire. Stay tuned for progress updates, tips and techniques. All comments are welcome. Email ljbrinker@yahoo.ca

Saturday, February 28, 2015

Oops

Some fun details.






what the heck


just found water

On Friday Glen, Bill, and I put the fascia on the wye, and painted the base coat in this area. Glens last 2 card holders were installed. A plexiglas protector was put in front of Harbour Freight at Northdale. Some grass was planted in the corner of Lincoln and the turnout for the work train was realigned.

Friday, February 27, 2015

Loft Barn

First I built a LAZERkit Xpress, HO loft barn kit from American Model Builders Inc.  Then I scratch built a small house and added to one side of the barn, covering up one large sliding door location. I replaced the man door below the loft, with the large sliding door and used the man door on a scratch built outhouse. A pile of chopped fire wood was added to the end of the house. A piece of quilt batting was spray painted yellow and put in the loft, to simulate straw.  As this sliding door was left open, a post and beam was added to the interior for visual effect. The structures were painted and weathered.  A wagon, fence, junk and other details complete the scene.
barn kit

buildings assembled

put on the layout

hand cut firewood

Tuesday night at the Huff and Puff

It was a dark and stormy night, but still many members showed up.  The cold snap did take its toll. A hand laid section Of track, on a trestle went out of gauge and a section of curved track lifted up, both were repaired by cutting out a small bit of rail to relieve the pressure from expansion. Jim started to program the Wellington turntable.  Bonaparte Wollen Mill was renamed Heinz Co. to allow form more variety in traffic. Bill finished his bike shop and is working on other buildings for this corner.

Bill added this little maintenance yard



track work done for work train and passenger track


new sign


come on, trying to program the turntable

piggy back ramp

Bills bike shop

Wednesday, February 18, 2015

Tuesday night at the Huff and Puff

Nice to see Cliff back after having work done on his knee and hip. Turnouts at the cement plant all installed and wired up. Town name plates were installed and Bill added a plexiglas protector for his cycle shop and railroad hotel area. One track of the double siding by Buckley Mill will become a piggyback ramp and one track at the corral in Lincoln has been modified into a team track.  The turnout for the upper loop has been wired, no more reaching over the buildings in the harbour. Several changes were talked about. First there should be a crossover to the coal dock lead in Miller, second there should be a crossover added to the upper loop, and third the switch to Wellington, on the upper loop should be moved out of the tunnel. Lots to keep us busy.


lumber load on flat car



Bill's Bike Shop


town name plates



new turnout at the cement plant

Tuesday, February 17, 2015

Update

The last couple of weeks have seen a lot of work done on the layout. Turnout work at the cement plant is on going. Running power to the upper loop snap switch has started, but a higher amp transformer is needed. Parts of the wye and some of the new turnout area in Lincoln has been ballasted. One corner of Lincoln is getting a rework and the removed buildings will find a new home in Northdale. Coal barges have been added to the coal dock. The cold, illness, and vacations have depleted our workforce, hope to see these members back soon.
Passenger and caboose tracks installed

Cut a door into backdrop at Tuck

new details in process of being added

coal dock and barges finished


Monday, February 9, 2015

Reworking turnouts

Several turnouts are causing engines to stall. We have started adding more feeder wires to the 2 center rails so that the points are not the only source of power. Any new turnouts will have jumpers from the outside rails to the matching inside rails.

Saturday, February 7, 2015

Miller coal dock

After removing the car float and it's dock, we decided to put in a coal dock to replace it.  The roadbed had to be raised to the height of the coal dock and new scenery applied.  The coal dock was designed to take 3 coal barges on each side, and 4 hoppers can be unloaded at a time.  All of the wood needed for the project was weathered with a mixture of India ink and alcohol. A piece of grid paper was taped to a ceiling tile and 2 strips of upside down masking tape was laid down to hold the posts in place for gluing. The height and length of the dock was drawn on the grid paper. One of the upper stringers was used to help line up the posts at the correct height. Then that stringer and a smaller one were glued on to the posts.  Two rows of posts were made with the stringers on the right side and 2 on the left. The bin to hang below the dock was drawn up and cutout to fit and glued between 2 rows of posts. Cross stringers were added at both ends and then the deck of Northeastern scale lumber, 1/8" scr. was glued on, leaving a slot for unloading coal into the bin below.  Chutes were made and gates were glued on.  They are operated with a pulley system, operated from the cross decks at the barge level.  It was painted and weather.
stained wood


posts and stringer glued and held in place with push pins

stringer and ore bin, bottom covered with card stock to look line steel

rivet detail put on with a pounce wheel

dock test fit

roadbed raised

finished coal dock