The tunnel near Lincoln was revised and reworked. It was moved so it was on a straight section of track, and an access hole was cut under it for access to any derailed rolling stock, just in case. The main line at Valleyview was moved over to give more space for a garage scene Bill is working on. Rock painting and wiring is ongoing. Ralph added scenery at the trestle approaching Pinehurst, on the branch line. Bill also displayed a tree he built by adding more branches to a dried sedum flower, which was then painted and dusted with green foam. Doug was doing road work at Lincoln.
|
sidewalk added to Valleyview |
|
Pinehurst Trestle |
|
reworked sedum tree |
No comments:
Post a Comment