Ralph set about wiring the branch line as Jim worked on the track work to the turn table. He also did some scenery near Elsewhere. With Jim's help, I put up more facia. Then Ralph showed me another roll of backdrop, a lumber yard. With many areas considered, a spot under the Long River bridge was selected, now it needs a switch. Glen dropped by with the conveyor for the ready mix plant. Bill worked on the scenery by the quarry, and all too soon, it was time to go.
No comments:
Post a Comment