Meeting night. After a financial report and an update on upcoming events the floor was opened to a general discussion period. Because of a lack of time and material work night was postponed, although more over center springs were added. While doing so a problem area where two turnouts join together was found in Herons Landing. One more project to be done. The lump in the siding to City Service in Miller was checked out. It will be worked on probably next week.
|
Problem turnouts |
|
Lots of engineers |
No comments:
Post a Comment