The Woodstock Model Railroad Club invites you to come along with as together we build an empire. Stay tuned for progress updates, tips and techniques. All comments are welcome. Email ljbrinker@yahoo.ca

Tuesday, June 23, 2020

Layout prepared for operations.

Glen and I went up on Tuesday to check out the layout. Trains were set up and all the starting positions were checked for proper rolling stock. After all was verified and corrected, Glen an a train from Wellington to Elsewhere, without any problems.
Covid rules.
                Face masks are required while operating or closer than 6 feet to someone else.
                 Practice social distancing.
                 Stay home if you don't feel well
Supplies are available for your use. Let's try and keep everything wiped down.

No comments:

Post a Comment