Most of the track is ballasted and track clean up continues. Everything but the turntable in Dover is wired and working. Although some scenery is down, there is a lot more to do. Even thought the layout if far from being completed, we will be open from 11 to 4 on May 1st, during the Woodstock Train Show. Our building it to the west of the Casino.
Drop in and see our layouts. The main HO layout has over 400 feet of mainline. We also have a 23 foot On30 shelf layout, a small HO DC layout and have started a 2 x 8 foot N scale layout. There may be a couple of displays also. Hope too see you there.
No comments:
Post a Comment