With only a few members out, we had lots of room to run. Installed some new card boxes to hold cards for trains staged in Elsewhere and Wellington. Elsewhere has been running without a hitch as far as I know. We may need to reduce the number of staged trains to achieve a correct balance in the yards.
This was before the card boxes were installed, but you can see how Elsewhere is staged.
Mike has run his battery powered engine a couple of times now, he seems to be pleased.
For more information check out his blog, a link to it is on the side bar. Pictured above is Mike's controller and the battery powered engine.
No comments:
Post a Comment