Town of Cartier takes shape.
Sawmill put back, needs some repair.
Big clean up of unused tables and chairs, plus deciding on where 2 donated layouts will go. One is a HO DC layout about 6 x 8 foot rectangle, which will sit on the kitchen island. The other an N scale layout which may go on the bar. The bar will also be an engine programme station and rolling stock repair area.
The branchline track was laid out and industries located, and the river near the Coal mine was worked on. The bridges were test fitted and the benchwork cutout for the river. The area then had a coat of plaster applied, even working in river rapids. When the river scenery is completed the mainline track's can be reinstalled.
Blue foam hills, scenery, feeder wires, electronic installation, and clean up, are ongoing.
We also received a donation of some engines for the club.
Bridges on the branchline installed.
No comments:
Post a Comment