| new station area |
The Woodstock Model Railroad Club invites you to come along with as together we build an empire. Stay tuned for progress updates, tips and techniques. All comments are welcome. Email ljbrinker@yahoo.ca
Thursday, April 24, 2014
New station
There is a long run between Valleyview and Wellington so we decided to put in another station. Now it needs a name. Keeping with our naming convention we can call it, Vanier, Vansittart (too long), Victoria, Vimy Place, Vincent, Walter, Warwick, Water, Waterloo, or Welford. What do you think?
Wednesday, April 23, 2014
Making the Railroad Layout Come Alive
Here is a nice, serene country scene with a classic gambrel roofed barn and wooden fence next to an unpaved country road and watched over by an imposing rock outcropping. But notice how this rural picture, nice as it is on its own, has gained some interesting appeal with the two Holstein "ladies" chewing their cud near the barn. It's no longer a static scene with the added animal life which will catch many people's eyes as they tour our layout.
The picture below is of a loading ramp running from trackside to the second story of a meat packing plant. A stockyard is being built [hint! hint! Jim L.] that will be located on the left side of this ramp. Stock cars will bring cattle along the track in the foreground and unload them into the stock yard. Then selected steers are directed over to the ramp and on to the packing plant. In this picture, you can see steers being herded up into the ramp which creates added interest to this scene. This track will also be used by refrigerated boxcars known as "reefers" picking up the meat products to be shipped to various markets.
The picture below is of a loading ramp running from trackside to the second story of a meat packing plant. A stockyard is being built [hint! hint! Jim L.] that will be located on the left side of this ramp. Stock cars will bring cattle along the track in the foreground and unload them into the stock yard. Then selected steers are directed over to the ramp and on to the packing plant. In this picture, you can see steers being herded up into the ramp which creates added interest to this scene. This track will also be used by refrigerated boxcars known as "reefers" picking up the meat products to be shipped to various markets.
Tuesday night at the Huff and Puff
Trent worked on his hill area, putting down grass. After arranging some buildings and foot print plans, some roadwork was done in Valleyview and on the power plant road. Backdrop painting began near Ridgewood and under the McDonald bridge. The DCC system wiring was started and throttles arrived, remember your checks next Tuesday.
| grass on Trent's hill |
| buildings at Valleyview |
| Ridgewood Falls |
| DCC module wired |
Tuesday, April 22, 2014
Friend connect
Someone left a message using friend connect, this blog is not set up for that system, so I cannot read it, sorry.
Friday, April 18, 2014
Quarry update
Jim and Don have put in a lot of time on adding scenery to this area. To start this story we had a rock wall from a previous layout, just to nice not to use, and it was a perfect fit for our quarry. It not only acts as the back of the quarry, but supports the upper level behind it, the location of our cement plant. The only problem is that we do not have a mold of the unique rock work on this wall, well not the only problem. The upper loop of track now needed some logical support system. Part of the trestle from the above mentioned layout supports the track over the entrance to the quarry (this was a S scale layout so the bridge timbers are very substantial for HO but it fit in.) The rest of the track is supported on a long narrow peninsula of rock, apparently the rock has been quarried up to the right of way, that's our story and we're sticking to it. A long rounded hill was added to the raw top of the wall. This now acts as a view block and softens the top of the wall. It was painted and dusted with grass. A steep hill was added to one end of the wall. The other end had its own problems. A hill was made to blend the wall, the top of the wall, the trestle, the backdrop it attaches to, Trent's hill, the lower level and two tunnel portals at different levels. That was even hard to say. Now someone has to paint all the rock faces to match the quarry wall and then Glen can put in his gravel plant.
| original wall section |
| wall section and hill above it in place |
| rock wall supporting the upper loop of track |
| hill added around tunnel portal |
| hill at the trestle end blending it all together |
Thursday, April 17, 2014
DCC system
Our shipment of Digitrax equipment has arrived. Barb Owen is putting our names on our own controlers and we will each get a receipt for it, thanks Barb. There is also two blister packs of electronics in the box. When it is all installed, we can run a train to see if we need to fix any bugs in the wiring and track work. Now we will have the struggle between operating and detailing.
Wednesday, April 16, 2014
Tuesday night at the Huff and Puff
Wow, after all this time, our ballasting crew is still at work, but mostly fixing up missed areas and patches. More backdrop was painted and some hills and rockwork went in around the loops. Lincoln and the branch line were also worked on. The inclusion of a junk yard at Valleyview was talked about. An area of a hill was cut away to put in a station on the long run between Wellington and Valleyview, Rod needs more stops for his new passenger train.
Pledge with future was added to the harbour.
Pledge with future was added to the harbour.
| water is running out of the harbour |
| Rod ballasts as Trent looks on |
| Doug lays track at Lincoln |
| tunnel on the branch line |
| Jim adds rocks at the cement plant area |
Subscribe to:
Posts (Atom)