Wow, after all this time, our ballasting crew is still at work, but mostly fixing up missed areas and patches. More backdrop was painted and some hills and rockwork went in around the loops. Lincoln and the branch line were also worked on. The inclusion of a junk yard at Valleyview was talked about. An area of a hill was cut away to put in a station on the long run between Wellington and Valleyview, Rod needs more stops for his new passenger train.
Pledge with future was added to the harbour.
|
water is running out of the harbour |
|
Rod ballasts as Trent looks on |
|
Doug lays track at Lincoln |
|
tunnel on the branch line |
|
Jim adds rocks at the cement plant area |
No comments:
Post a Comment