As some members operated on a truncated layout (missing Elsewhere) 4 or 5 of us continued the reconstruction of Elsewhere. The east yard has all the trackwork installed and as the yard tracks were not touched, all the feeders are intact. The new turnouts will need feeders. The east end ladder of the west yard needed 1 inch spacer tracks added between the turnouts to make room for the throw bars. All of the trackwork is in place at this end of the west yard and has small areas of ballast glued down to hold it all in place. The west end ladder of the west yard is laid out and it's arrangement was approved by the group. All of the west yard will need new feeders.
Once the west yard is in place and glued in place the entire area will be tested by running groups of cars through all the turnouts. Then feeders will be added. When ballasted I hope we can use a different colour on the through track to differentiate it from the yard tracks. We were able to make all of the yard tracks 6 1/2 feet long or longer. This will set our maximum train length. Train consists will remain intact in Elsewhere with their cards. Mainline trains will be broken down in Wellington, Branchline trains will have to be routed to Wellington, as a through train, to exchange their cars, they could switch Herons Landing on their way, or not.
No comments:
Post a Comment