John, David and I started the prep phase.
All of the buildings, and scenic material was removed from Miller and Northdale. All the Branchline specific rolling stock and cards moved into the office racks. The rest of the rolling stock was put in the yard at Wellington, the yard is quite full. The DCC power to the branchline was unhooked. Curtains were taken down at Miller. All of the above material was put in crates and stored under Springbank. So we don't need any boxes for storage. We do need some garbage bags.
There are 9 mainline trains set up for next Tuesday.
No comments:
Post a Comment