Except for the loop end, all of the blue, foam board was glued up and fitted, and the backdrops put up on both sides of the peninsula. The foam needs to be screwed down, the front edge trimmed, and then painted. Glueing and taping the pieces together to make up the a section, to cover the benches, is working well. All the backdrops need to be painted or touched up. The basic benchwork structure should be ready when restrictions are lifted.
No comments:
Post a Comment