The east wall was not touched but the rest of the layout has all the benches screwed in place, cleats for backdrop installed and foam cut for all areas. The foam pieces for each bench will be taped and glued. After the backdrops are installed the foam will be installed and trimmed.
I guess the next step would be to paint the foam an earth colour. When the lock down is over and we can get together, and when the paint is dry, all the buildings can be placed and their final positions, and the track plan can be decided. At this time any foam cutting or adding layers and levels can be worked out, including cutting out the harbour area.
No comments:
Post a Comment