The Woodstock Model Railroad Club invites you to come along with as together we build an empire. Stay tuned for progress updates, tips and techniques. All comments are welcome. Email ljbrinker@yahoo.ca

Wednesday, December 1, 2021

Meeting night

 Treasures report was accepted. Dues will remain the same. The group did very well selling some of the club's inventory at the last show.

Alternative work times was another topic. With available keys, anyone may come in at any time and in fact several members are doing just that, for various reasons, like, if your working on the electronics there can't be people working on the track at the same time. 

The N gauge layout will be placed over the old stove, until the stove is removed. Still waiting on the fair board for that. This extra module is not a priority at this time, nor is the DC layout, but these provide other work opportunities for more people.

 In short, options for our operating system were laid out. This system was developed after discussion and analysis of ours and other systems short falls. Samples of a new card system were looked at, discussed and accepted as developed. This Card system will include designated holding tracks in Elsewhere, 2 interchanges, all of our old unit train, Train Orders, and Card Cards for each piece of rolling stock. These will identify the rolling stock and it's forwarding information. There is also a self correcting component which requires that at each industry where an operator drops rolling stock they pick up any rolling stock and car cards at that industry. The last fail safe is, if there is any confusion about what to do with misplaced  cars or cards,  return them to the storage yard, the error will eventually correct itself. More detailed information will be in future posts, handouts and discussions.

Paint booth options were talked about. The area by the unused water heater was deemed good area as there is a vent hole there.

 Wiring progress. All the mainline from Lincoln to Admiral is up and running. More bus wires will be run, so that the area from Lincoln to Dover can be worked on, feeders are already done. The electronics for this area will be installed soon. It was decided to use a reversing module to control the power to the turning track.

 The bar area will be our rolling stock repair area and the program track will be wired in there. Eventually shelving and part storage areas will be added. There were other ideas for this area, but......đŸ˜¥

No comments:

Post a Comment