The Woodstock Model Railroad Club invites you to come along with as together we build an empire. Stay tuned for progress updates, tips and techniques. All comments are welcome. Email ljbrinker@yahoo.ca

Thursday, October 9, 2014

Tuesday night at the Huff & Puff

Will have to come up with a newtitle for these updates. Work is being done on other days to get ready for the open houe on Oct 19th. Asection of the mainline was lifted to remove a dip and two yard tracks were instaled at the same time. Fences were installed around the junk yard, elevator, and lumber yard. A couple of new buildings were added as well as more rolling stock. Scenic details were added here and there,it's amazing how they bring the layout alive. In the middle of all this, many trains were run.
Cliff runs his train on the lower level main

fence for the lumber yard

ice blocks on the icing platform

train approaches Jutland station

Don runs the first train through Miller

tank cars for the refinery

Jm switches the Port

work train at Lincoln for mainline repairs

Ralph and Bill check out a locomotive

Trent admires his new train

Bill added a depot to the refinery

cutting up a log

Cliff's junk yard takes shape

main repaired and two yard tracks installed

adding scenery behind the roundhouse

Monday, October 6, 2014

Tuesday night at the Huff and Puff

Beside some cleaning and a new yard in Lincoln, most members ran trains.
new ore train

just made it through

Rod is quite happy with his train

through the cut to Wellington

new work shed

Wellington yard

a new yard for Lincoln

Wednesday, October 1, 2014

Thuesday night at the Huff and Puff

Wiring on the branch continues as more people, buildings and scenery are added. Lots of trains were run as well. Here are a few pictures to show the activity.
Cliff's Junk Yard


Bill the butcher, oops

hot dog vendor

new building at Heron,s Landing

Don at work, Rick looks on

Tom checks things out

Jim runs his train through Springbank

Sunday, September 28, 2014

Sunday fun

Some wiring was completed. Some crossings were installed. Some plug-ins were installed. Some people were added. Some buildings were test fit and then cut in half, sorry Bill. Most of all some trains were run. N.B. The plane is a B17, the Yankee Lady.
the big meet

heading to Jutland

installing crossings

seems like Ralph gets to do all the wiring

Trent and me installed the last of the plug-ins

you build it and they will come

look what flew over my house, B29?

Saturday, September 27, 2014

Runing some trains

1023 pulls into Lincoln

Tyler pulls the local out of Jutland

McDonald's Crossing

Bill's coal drag on the Long River Bridge

on the high line

turning a monster

Rod runs through Valleyview

Thursday, September 25, 2014

Tuesday night at the Huff and Puff

Scenery was worked on at Heron's Landing, the coal mine, and Lincoln and all the while trains were running.
church and sidewalks add to Lincoln

area around meat packing plant




grass mat added to town

buildings at the container dock

coal mine hill gets some trees

tracks to Miller

Saturday, September 20, 2014

Friday Free Time

I had some free time (read my wife went shopping) so Bill and I went up to the Huff and Puff do some work. The outside edge of the curve around Lincoln was ballasted and edged with grass and weeds. Many plank road crossings were added where roads had been added, still need more though. Bill cut down a rock outcrop with a hole saw, which was too close to track. He also found a switch which was giving trouble when you back through the diverging route. We finally found that the point was too wide and was catching the wheel flanges, lifting them ontop of the rail. The point was rounded off and thinned down with a file, eliminating the problem, will have to check the other points for this problem. A few other switches were found to have ballast interfering with smooth operation, this was also corrected.
cutting down the rock face

problem point

point being filed down