The Woodstock Model Railroad Club invites you to come along with as together we build an empire. Stay tuned for progress updates, tips and techniques. All comments are welcome. Email ljbrinker@yahoo.ca

Thursday, December 24, 2015

Car counting

I tried to estimate our car requirements. At any time there are about 90 cars at industries plus say 3 trains with 8 cars or another 24 cars or 114 cars in total with none in the yards, so add another 90 cars for the next day and you get 204 cars max. Cars needed. The total 2 top days in a row, for all car types is 198 cars. That puts 42 cars in each of the 2 yards, with 3 trains on the layout, that I would guess would be a good max. count. The total industry car count only varies by a max of 6 cars for any 1 car type, per day. Guessing the car count for any type will only drop by 10 or under, for the first 4 trains of the session, until trains start returning, maybe we could use 1/2 the next highest count for the min. Cars required. This works out to 46 to 58 box cars, 31 to 43 hoppers, 18 to 24 covered hoppers, 14 to 17 flat cars, 10 to 13 gons, 8 to 10 refers, 19 to 23 tankers, 8 to 10 stock cars or 154 min to 198 max. That means at the min. count there would be 20 cars in each yard with 3 trains running, a much better number. This does not include piggyback cars and sawdust cars maybe a total of 5 cars. I have no idea how close we are, but I would guess we are close to the min.

Branch card system

How this sound. The first idea was to select the cards and then use them in a reverse order to the main, that is, you would first pick up cars at the locations your will deliver to, take them to Elsewhere and then get the cars to deliver, not the ones you just delivered. Confusing and you would always run the same cars both ways.
What if you select cards. Say you have 1 box car for the pier, 2 hoppers for the coal dock, and 2 flat cars for the saw and a passenger car. You pick up the cars at Ortona from yesterday's freight and a passenger car. Deliver yesterday's cars to Elsewhere, stopping at all passenger stations on the way. Turn your engine after setting out the cars and make up the return freight. You would leave Elsewhere with 1 box car, 2 hoppers, 2 flats and your passenger car. Stop at all mainline station on the way to Miller. drop 2 flats at the sawmill, and pick up the cars there, say 3 flats. Then drop 2 hoppers at the coal dock and pick up the cars there, say 1 hopper. Proceed to Northdale stop at the station and deliver the box car to the pier, picking up the cars there, say a box car and a flat car. Return to Ortona dropping the passenger car, 4 flat cars, 1 hopper, and a box car. So now there are 6 freight cars for the next train to take to Elsewhere. This is more like the mainline trains and the consist will be different both ways.

Wednesday, December 23, 2015

Lincoln plan update.

Changing the way we run the branch line, running it as a separate railroad that now interchanges with the mainline at Elsewhere, has had an impact on the Lincoln update plan. We no longer need the interchange yard at Lincoln, and do not need to reroute the mainline. It now boils down to adding another run around to help the switcher to set out and pick up cars, and moving a few buildings.
A lot of discussion was held about changes at Lincoln. A plan was made that requires little track work changes. It involves, moving the freight station to where Allen Lumber is, which opens the space to make another run around using that siding. Move Allen Lumber where Buckley Mills is, and move Buckley Mills to the other side of those 2 sidings, this makes uncoupling rolling stock at both of these industries better. Shorten the siding that now services Hay Co. and put the piggyback ramp there, just to the right of Hillcrest Packers. Put the city block where Hay Co. is, and move Hay Co. where the old Miller Interchange yard is, removing the 2 middle tracks and shortening the back track, which will serve as a log dump track. It was also suggested we put in some tanks for bulk glue.

We need a name for the branchline, O & E (Ortona and Elsewhere), M.&N.W. (Miller,and Northdale , Western), M & N R.R. (Miller and Northdale Railroad ). Any input is welcome! 

This coming Sunday morning and Tuesday night are work days, bring your tools. 



The crossing shanty, water tower and the freight station will be moved and a turnout will be installed on the track to the right of the crossing shanty and the track will be connected to the track at the freight station, giving us a new run around.
The track that looks like it is headed towards Hillcrest Packers will be the new piggyback ramp track.
The yard in the distance will be the new home of Hay Co.

Tuesday Night at The Huff & Puff

More rolling stock has arrived, thanks to all. Discussions were held on the Lincoln update, more on that later. Thanks To Doug for the ice scrapers and pen sets. Thanks to Don for his raisin, oatmeal  cookies. Don also suggested that people wait in the crew lounge for train assignments, to reduce the congestion at the start of a session, what do you think?


 Glen installed the rock liner for the upper loop tunnel.






The ore train got it's first run in a long time.




Things that can be worked on during the work days, Sunday and Tuesday.
Finish the Trent's Hill tunnel and wire and electrify that turnout.
Work on the scenery at Wellington Station.
Install Heritage Furniture.
Ballast and wire the Valleyview crossover.
Install, wire and ballast the Miller crossover.
Install a turn off switch for the branchline engine house.
Install and wire the new supper snapper.
Clean the branchline track.
Clean up office and remove clutter around the layout.
Lincoln update? See next blog entry.

Monday, December 21, 2015

Thoughts from Gap

running the branch train as a mixed is a good idea. CN did this on many branch lines in the 50's. Psgr cars could include a coach,a baggage car or combination car for mail/lcl express/baggage.These were on the tail end of the train of course.

The mixed could be run from the end point on the branch six days a week alternating the destination yard and having it return shortly after arrival back to the branch. This type of operation was very common in steam days. Running it this way avoids having the confusion of cars dropped at Lincoln 
Never thought about running the branchline train from Ortona. Cards could be there and passenger cars could be stored there also. May work. 

Friday, December 18, 2015

Ore train

When the cross over in Miller is installed, we should start running an ore train, what's your thoughts.
X number of cars run from Ortona straight to Elsewhere? Should a smaller number of cars be brought to Lincoln until there is enough to be run on the mainline? When it is run to Elsewhere or Wellington should it wait for another train order, or wait a few minutes and returned to Ortona? Should it be run around one of the loops and return immediately? Should it run every day? If run more than once every 5 days, should the car could vary every run? Should we add a siding for it in Elsewhere? Any other ideas?

Branchline idea

What if we run a branch line freight from Elsewhere to the Ortona yard and back. This freight would only switch the branch line towns, Miller, Northdale, and Ortona. Why? This would take pressure off the mainline as 1 train crew would be on the branch line. It would take congestion out of Lincoln, because this train would only pass through Lincoln.  It would eliminate the confusion about the cards and switching the branch. It could be a mixed train with a couple of passenger cars. It would reduce the changes we have to make in Lincoln. How? Use the another set of card holders, which we have, for the branchline cards. It would be run as a separate railroad with its own set of cards. It would interact with the mainline from Elsewhere, eg a lumber load to Hillside Lumber driven by the mainline cards. This may require a through freight to return flat cars for lumber, tank cars, and coal hoppers needed for branchline industries from Wellington to Elsewhere. Maybe this could be the first part of this train order. You would pull the cards for the branchline mixed freight, if some of the rolling stock is not in Elsewhere, you would get them from Wellington. The log train will be just a branchline operation.
What do you think?