More rolling stock has arrived, thanks to all. Discussions were held on the Lincoln update, more on that later. Thanks To Doug for the ice scrapers and pen sets. Thanks to Don for his raisin, oatmeal cookies. Don also suggested that people wait in the crew lounge for train assignments, to reduce the congestion at the start of a session, what do you think?
Glen installed the rock liner for the upper loop tunnel.
The ore train got it's first run in a long time.
Things that can be worked on during the work days, Sunday and Tuesday.
Finish the Trent's Hill tunnel and wire and electrify that turnout.
Work on the scenery at Wellington Station.
Install Heritage Furniture.
Ballast and wire the Valleyview crossover.
Install, wire and ballast the Miller crossover.
Install a turn off switch for the branchline engine house.
Install and wire the new supper snapper.
Clean the branchline track.
Clean up office and remove clutter around the layout.
Lincoln update? See next blog entry.