The Woodstock Model Railroad Club invites you to come along with as together we build an empire. Stay tuned for progress updates, tips and techniques. All comments are welcome. Email ljbrinker@yahoo.ca

Wednesday, March 8, 2017

Fork truck needed.

I'll be first, if anyone has a spare fork truck, we could use 1 for the pier at Northdale. Crates, barrels and dock workers would complete the scene.

Tuesday meeting night 3, 7, 2017

Lots of topics were discussed. We decided to get a package of Dust Monkeys track cleaners and will do a post on them when we get them. Members will now be able to post railroad related items for sale or what they are looking for on the blog, this is a trial, and the seller is responsible for the items., not the club. We also agreed we will limit freight cars to 50 feet long, so all the ones over this length will be replaced eventually. Not only will this save space but also get us back to our 50 to 60 era.  The idea of having an everything goes night also came up. We will have to talk about this later. Progress at Wellington is going well so looking forward to normal operations we reviewed running the branch freight with the cards at Wellington and holding an old time passenger train in the Ortona yard. When this happens I will post the sequence on the blog. Sequential switching will also be tried then.
Scenery at Wellington 

Looks like problems up the pole.

Friday, March 3, 2017

Friday fun 3,3,2017.

Strip, tin, solder, strip, tin, well you get the point, lots of feeders put in. The second half of the turnouts are also wired up. Scenery has been added around the freight yard and Cullen Mill. It is amazing how a couple of foreground buildings can make the background look better. Great Lakes Steel building flats, were moved over a bit for a better looking arrangement. The branch line cards were moved to a rack at Wellington, as we are going to try running the branch mixed from there. It should be mentioned how patient everyone has been during the changes to Wellington which should soon should be completed. It sure looks like a better arrangement.
Great Lakes Steel behind the  bridge. 

Lots of  wiring 

Scenery!

Thursday, March 2, 2017

Sequential deliveries.

Here is an idea to ponder. A long time ago Mike talked to me about the fact that with our card system we never pickup and deliver anything. At the time I didn't think it would be possible, but let's take a look. Say your train is leaving Wellington, 1 card is to deliver a box car to Hayes Co. which will delivered there and all cars will be picked up there as usual. The next card of our 2 card allotment is for 3 tank cars to Shell Oil in Springbank. And 3 tank cars are in your train, but next the dispatcher also includes a card for 3 tank cars to Coastal Oil in Herons Landing, but these cars are not in your train. The process will go like this. You have left Wellington with 3 empty tank cars for Shell Oil in Springbank. You drop off the empty cars and pickup any loaded cars there, filling out the requirements of the first card. When you arrive in Herons Landing you drop off the loaded tank cars and pickup the empty cars there, filling out the requirements of the second card. These cars are then delivered to Elsewhere. The operator now has a sense of completing an actual task. This double move fits flawlessly into our card system, the guy who designed it is brilliant, lol. This double move could be used for other paired industries as long as their siding capacity is the same.

Wednesday, March 1, 2017

Tuesday Night at the Huff and Puff 2,28,2017

Glen added a couple of buildings and a road behind Cullen Mill as Wellington starts to get scenery, Don hinted a large stone building may be coming as we all had a hand in building it. More feeders were added. Rolling stock was placed at the industries in Wellington to get a sense of the capacity of the sidings. Restricted trains were run over much of the railroad. Next week is meeting and work night.
Glen hard at work

Lincoln is always busy

Map tape added to fascia


Great Lakes Steel background 


Sunday, February 26, 2017

Friday and Sunday Construction

The ore track is finished except for feeder wires, but first we need to decide if we  want to be able to power it on and off. Glen worked an the steel mill backdrop to make it more realistic. Most of the ballasting and some of the feeders are soldered onto the track and half of the turnouts are also wired up in Wellington. Because the freight yard is all wired up, we loaded it up with rolling stock, 50 in all. With that done and some shuffling all the rolling stock is in its proper place again.
Ore train waiting to be picked up. 

Freight yard loaded with rolling stock. 

Wednesday, February 22, 2017

Tuesday Night at The Huff and Puff, 2,22,2017

Wellington is taking shape, ballasting, and feeder wires being installed. Most of the buildings are in their new positions. Glen pointed out that the ore track needs feeders. Tate brought in a tanker truck, cool (I wonder if he has ever heard That? ).
Will need to clean out Elsewhere and drill out holes for wires and switches and then vacuum up the mess.