The ore track is finished except for feeder wires, but first we need to decide if we want to be able to power it on and off. Glen worked an the steel mill backdrop to make it more realistic. Most of the ballasting and some of the feeders are soldered onto the track and half of the turnouts are also wired up in Wellington. Because the freight yard is all wired up, we loaded it up with rolling stock, 50 in all. With that done and some shuffling all the rolling stock is in its proper place again.
|
Ore train waiting to be picked up. |
|
Freight yard loaded with rolling stock. |
No comments:
Post a Comment