Will need to clean out Elsewhere and drill out holes for wires and switches and then vacuum up the mess. |
The Woodstock Model Railroad Club invites you to come along with as together we build an empire. Stay tuned for progress updates, tips and techniques. All comments are welcome. Email ljbrinker@yahoo.ca
Wednesday, February 22, 2017
Tuesday Night at The Huff and Puff, 2,22,2017
Wellington is taking shape, ballasting, and feeder wires being installed. Most of the buildings are in their new positions. Glen pointed out that the ore track needs feeders. Tate brought in a tanker truck, cool (I wonder if he has ever heard That? ).
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment