The Woodstock Model Railroad Club invites you to come along with as together we build an empire. Stay tuned for progress updates, tips and techniques. All comments are welcome. Email ljbrinker@yahoo.ca

Saturday, September 21, 2013

Track work in progress

Track is code 100 and switches are Atlas number 6, with 30 inch radius on the main line. A 2 percent grade is maintained on the main line. The road bed is used industrial ceiling tile, turned over and painted brown. 
tracks for the staging yard being installed


Ralph working on staging track to the manual turntable



Ralph and Doug installing a switch on the lower return loop


tracks in the port area with bridge location on upper line



Matt, Doug and Larry laying out coal branch

One of Hank's bridges reworked from S scale



group discussion over upper return loop location and support

No comments:

Post a Comment