Vacations have lowered our attendance, but construction continues. The two reversing loops were tested successfully. Two of us ran engines with track cleaning cars over most of the layout, fixing problems (mostly wayward ballast or solder) as we went. Tom worked on the mountain near Lincoln and Ralph did more track work on the branch line.
|
Mount Tom |
|
Ralph is adding an engine terminal at the end of the branch line |
No comments:
Post a Comment