As the track cleaning continues, we continue to find minor problems to be corrected. Doug found a rail joiner under the rail, that took a bit to fix. We also find dirty rails and wayward ballast and once and a while, solder above the rail head, all fixable. We're testing each rail with an engine to make sure the repairs work as we go. There still seems to be conflicts with the DCC system, which are being sorted out, like programming an engine with three digits, even with a zero proceeding the number. Glen continues to work on the Warwick station area and we filled in some gaps in the ceiling tile base. A stop was added to help line up the car ferry platform at Northdale . Note no pictures as I have a PC problem.
|
checking the DCC manual |
|
stop for the car float unit |
|
quarry area detailing |
No comments:
Post a Comment