Quad unit up and running. Two of 3 throttles test out OK, but still act up on our layout? Jim spent most of the morning reading the manual for anything we missed. Work continues on the branch line, with the roadbed replaced in both tunnels. Don brought in 6 shelves which were mounted around the layout. These will hold your car cards while switching various towns and protect some of the throttle pockets at the same time, nice.
|
new backdrop for the wye |
|
Don's new card shelves |
|
new track through the lower tunnel |
No comments:
Post a Comment