Our fleet of hopper cars has increased by 14 so the coal mine is open for business. Don brought in an Atlas snap-relay that will make it possible to add signal lights to the high line loop switch, and Trent added a tank truck to the layout. Ralph and Don worked on the repairs to the branch line as Jim and Jim read through information on the Digitrax system, looking for a solution to our throttle problems. We also had a few guests to show around.
 |
| new truck |
 |
| visitors |
 |
| relay for turnout signals |
 |
| more hoppers |
Layout Power Procedure.
-turn on the MAIN SWITCH
-turn on the COMMAND CONSOLE MASTER SWITCH/SPLITTER BAR
-on the DT400 press the PWR button
-on the DT400 press the Y+ button
power off
-on the DT400 press the N- button
-turn off the COMMAND CONSOLE MASTER SWITCH
-turn off the MAIN SWITCH.
 |
| DT400 |
No comments:
Post a Comment