Financial report was accepted as read. Members reported on the Hamilton layout tours, some great layouts were visited. Rob has catalogued our video collection, a list is on the bulletin board.
Meanwhile in the layout room, all hands were on deck. All of the track laid in Lakeview is wired in. Ortona wiring and the logging spur continued. Glen continued adding scenery in the sawmill area. Joseph discovered a slope in the Ortona yard causing run away rolling stock. A few shims under the roadbed corrected the problem.
Peter and Rob add feeders on the left. Donald works on the Miller passing track. Mike and Larry work on the logging spur. Jim and Joseph work on the wiring to the Quad. So far #3 bus is short free.
The logging spur is mostly still up in the air, but the route and the placement of the trestle have been decided, but the loop area needs to be wired first.
Friday 1 to 3 will be the next construction opportunity.