The night started with a problem solving exercise. There was no power to Wellington, Elsewhere and the loops. Knowing the last section wired was the upper loop, the power feed to block 2 was removed. We now had power everywhere but the upper loop, so there must be a short in that section. Under the bench work I go. It's hard to figure out where you are under there, but a set of backward wires was found. With Glen as my eyes above the layout we found that a turnout was wired backwards, problem solved. By then most of the members had arrived and we started the nights ops. Our operating sessions are are not organized as yet so operators make up a train and run it. After the construction is finished we will try to set up a system of train orders.
A couple of buildings with local business signs.
Trent, Tate and Don all switching Heron's Landing.