What a great night. All of our construction materials were sorted and stored on and under the sections of the layout already built. The west wall section was completed. A lot of single frames were built. The east wall loop and several and several single frames were installed, after vents were installed on the water meter box. The paneling covering the water pipe was replaced. Cabinets are tables were moved.
The toilet was replaced and the water turned on. Don P. Suggested we put the main yard on the west wall to make use of the row of spot lights there. Cliff, Rob and Glen are getting the rest of the lumber from the trailer on Friday and I will open the club at 1.
No comments:
Post a Comment