March 23
Rob and his wife cleaned up the yard around our building, 5 bags of leaves and vines, great job!
Support frames along the south wall, and from the east wall to the centre peninsula were put in. Then with a screw, in the floor, and a 6 foot cord, Mike drew a circle on the floor where the central peninsula will be. This will help us locate it's final position while maintaining optimal aisle widths. The end of this peninsula is the last section of frames left to be built.
Benches continue to be constructed but we are running out of 6 foot 1 x 3 lumber, so we are going to build a few 5 foot ones.
No comments:
Post a Comment