Tuesday night at the Huff and Puff. Our small work crew got down to work putting up the framework for the main section of the centre peninsula. It has become apparent the floor is not perfectly level so we will have to make adjustments where necessary. We then decided to loose 4 inches of space on the west wall side of the layout, and cover over the dart board frame. In assembly line fashion, we measured, marked, cut and stacked most of the components for the 13 frame members for the west section of the layout. We only got part of the loop end started before we called it a night. Next work schedule is Friday at 1.
No comments:
Post a Comment