Monday morning, Ralph, Tom and me when to the layout of a couple of hours. Ralph did more work on the branch line, Tom poured more rocks and vacuumed, I painted some more backdrop and moved The Buckley Mill at Lincoln, to the track on the left The right hand track was straightened to make room for the freight transfer building Ralph is making. It needed room for trucks to arrive at the docks on the other side of the building from the track. I may have to add a roof over the truck doors on the mill and make a grain unloading pit under it. Sorry, we had to cut a couple of feeder wires.
No comments:
Post a Comment