Put in the inbound/outbound yard and the industrial run around. The industries were put into position and tracks were positioned to them. All of the turnouts on the far side of this yard will be powered. The freight yard was also laid out with its runaround and the sanding/fueling tracks. Once everyone agrees to the layout, it will be installed. The new ore track was installed.
|
Yard tracks |
|
Freight yard |
|
Ore siding |
No comments:
Post a Comment