Construction continues. All the upper mainline benchwork was finished up. Members began setting out the track to see what the best arrangement would be.
![](https://1.bp.blogspot.com/-o4ljk2yoHKw/XS52eNY1eRI/AAAAAAAAFAc/BTTLGwhc8UElUtpG2Na4vb-d8_L8VfjgQCLcBGAs/s320/20190716_202638.jpg) |
The area where the coal mine will be. |
The plywood for the sawmill area was cut out but not installed. Meanwhile the benchwork for the loop into Miller was cut out and installed. We also did a scrap clean up.
![](https://1.bp.blogspot.com/-lhpcnexaCSg/XS523Z1sSEI/AAAAAAAAFAk/EhNZVHOuCGUVaycZJl21ZMO8fjNpfotKwCLcBGAs/s320/20190716_202650.jpg) |
Benchwork for the loop into Miller. |
No comments:
Post a Comment