Members accepted the financial report as read. As a few visitors toured our layout, work was on going. The turntable was moved from Lincoln and replaced by Schell Industries.
The ready mix part of Schell Industries will be added to Zorra Cement.
Buckley Mills replaced Schell Industries in Herons Landing
Work was started on re-routing the sidings to Gay Lea Foods and Allen Lumber.
The benchwork from Ortona to the tunnel loop was cut and a few supports were added to hold it up. The grade still needs to be checked and adjusted.
It was also decided that the ore train will be staged in Ortona. The run will be; the ore train has been delivered from the, off layout mine to Ortona yard, it is picked up and delivered to Great Lakes Steel where it is unloaded, after unloading it is returned to Ortona yard where it is held to be "delivered " to the mine.