Sept. 17 2021
Rod and Donald worked on the the west peninsula. Rod laying track in the TATHAM area and Donald worked on the remote switches for the passenger terminal tracks.
Larry M. put in the last of the framework for the shelving under the center peninsula.
Don S. put down plaster cloth on his Newfoundland Railroad and also cut some 2 inch risers for the branchline, which Glen and I turned into benches, so now all of the branchline benchwork is finished. The grade is 2% or less, I think.
No comments:
Post a Comment