Dave sent in 4 plate girder bridges he lazer printed and painted a weathered green, and Glen worked his way out of Admiral and into Burtch, home of the lumber camp.
Rod put in a missed set of insulated rail joiners and then came over to Wellington to help me work on the ready yard. Three turnouts were also set in place for the storage yard, inside the loop.
Tom completed both mainlines to the Thames River Bridge. When the loop around Admiral is installed, we will have over two thirds of the mainline done. The areas on either side of the mainlines between Lincoln and Sunset would be a good area to build rolling hills.
No comments:
Post a Comment