Glen and I worked on Admiral, opening up the access hole so you can stand up in it. The bridge to nowhere was installed. The mainlines toward the loop around Admiral were also extended.
Toot, toot, the first train was run. It is a DC engine and some cars. We are using it to test the track.
No comments:
Post a Comment