The thermostat for the furnace has been moved to a leg of the layout, for easier access.
Both new doors have been installed on the bathrooms, a new seal and connection are needed for the replacement toilet, to get the second bathroom functional.
The track was laid on the elevated town of the branchline, still needs to be tested. Some foam carving was done on the road up the hill at the back.
No comments:
Post a Comment