Sawmill
The sawmill was set on a piece of foam, as the branchline is only 1 inch higher at this end. An extra piece was cut out to form a log pond. The rest of the sawmill buildings were set on the mainline level, where the lumber will be shipped via the mainline. The branchline will run down from this 1 inch level to join the westbound mainline, to get to the Port, by crossing over the eastbound track.
No comments:
Post a Comment