Foam roadbed has all been painted. The cabinet, castings, electric supplies, and shelves were stored under the benchwork. Some buildings were unboxed. Starting next week all the major industries will be, as we find them, will be put into test locations so a track plan can be finalized. Actually the loop by the door can be laid, wired, and ballasted, as it's location is fixed.
The branchline island was test fitted.
No comments:
Post a Comment